Kitchen Contractors in Tampa, FL

One Tampa team for your kitchen design, cabinets and countertops

Kitchen contractors in Tampa come in very different shapes. Some run whole remodels, while others only deliver cabinets. Before you sign, ask which parts of the kitchen a contractor coordinates and which stay with other trades.

At Cabinet IQ of Tampa, we coordinate your kitchen design, cabinetry, countertops and their installation. Our fabrication and installation partners template, cut and set the stone and install the cabinets, and we stay accountable to you.

Other remodeling work, such as plumbing, electrical or walls, is addressed as set out in your agreed proposal. Our showroom is on Gunn Highway in the Carrollwood area. You’ll work with Watson Occilien, who owns the business, and Katya Medley, our designer with more than 25 years of experience.

What we coordinate in a Tampa kitchen renovation

In a Tampa kitchen renovation, we coordinate the parts of the room you see and use. That means the design, the cabinets, the countertops and their installation.

We carry custom, semi-custom and stock lines, and we’ll say so when the less expensive tier does everything you need. In a conditioned Tampa home, the cabinets that deserve the closest look are the sink base and the run beside the dishwasher. Those are the spots where a slow drip can go unnoticed for weeks.

We offer quartz, granite, quartzite and porcelain, each cut to a template taken from your installed cabinets. Porcelain is the surface many Tampa homeowners don’t think to ask about. It’s thin, it handles a hot pan and it holds its color in strong light.

Nothing is ordered until you’ve approved a design showing the real cabinet line, door and stone. Say you’re torn between an island and a peninsula. A 3D rendering shows how much floor you’d have left between the seating and the range.

Your kitchen renovation timeline, stage by stage

Your calendar depends mostly on the cabinet line you choose and the scope in your proposal. Each stage below closes before the next starts, and each one ends with what decides its length.

Visit the showroom on Gunn Highway or call (813) 210-9982 to set a time. Photos of the room help, as do the model numbers of any appliances you plan to keep. If you still have the survey from your closing paperwork, bring that too.

This first meeting is also where we agree the scope, so it’s settled before a single cabinet is ordered. The calendar really starts here.

Detailed design covers your layout, 3D renderings and revisions, and it starts with a design retainer. The retainer is credited toward your cabinet order. Our design team builds the rendering around the cabinet tier, door style and stone you’re leaning toward.

Ask to see the kitchen from the doorway you use most, not only from overhead. That’s the angle you’ll look at every day. This stage lasts as long as your decisions do, and no install date is set until you’ve approved the design.

Cabinet and countertop work alone rarely needs a permit. If your proposal includes other remodeling work, it sets out how that work and any permit are handled.

Our installers and fabricators have more than 20 years of experience, and they work from your approved design.

The installers set the base cabinets first and bring them to level, because the countertop template is taken from them. Slab floors in older Tampa homes are rarely flat across a whole kitchen, so careful shimming along the base run comes before anything else.

Stock cabinets have the fastest lead time of our lines, while custom cabinets are made to order, so your cabinet tier is the biggest factor in the gap between approval and install day. The stone comes on a later visit, once every base cabinet is set and level.

Have your sink chosen before template day, with the faucet and cooktop models confirmed. Every opening in the stone is cut to fit them, and an opening can’t be made smaller once it’s cut.

When the stone is set, we go through the room with you drawer by drawer and note anything that needs adjusting. Pay closest attention to the tall pantry doors and the cabinets beside the refrigerator. Those doors swing the widest, so they’re the first to show if alignment is off.

Run water at the sink and open the dishwasher fully while the crew is still on site. A tight clearance is much easier to correct that day than after everyone has packed up. The project is complete once anything noted on this walkthrough has been adjusted.

Why Tampa homeowners choose Cabinet IQ of Tampa

Four things set a kitchen renovation with us apart:

What you getWhat it means for your project
Design led by 25+ years of experienceKatya Medley plans your kitchen around how you cook, store and move through the room.
A 57-point quality checkYour finished design is checked against 57 points before the cabinets are ordered.
One point of contactWe coordinate design, cabinets, countertops and installation, and we stay accountable to you for all of it.
A 12-month workmanship warrantyOur workmanship is covered for 12 months. Manufacturer warranties vary by product line, and we share the terms for yours.

Homeowners describe it in their Google reviews:

“The team had good communication with us. Good quality cabinets. Nice colors too. Special thanks to the Design team and Installation guys.” Jane Dao

“We are absolutely delighted with the exceptional work Katya Medley did on our kitchen. I love my cabinets and countertops.” Sylvia Oliveira

Living with a kitchen renovation in Tampa

A few weeks without a kitchen go more smoothly when meals, deliveries and the weather are planned for. Here’s what helps most:

  • Set up a temporary kitchen near a working sink, such as the laundry room
  • Keep the AC at its usual setting for the whole project, even on days the house sits empty, so the cabinets go in at the indoor humidity they’ll live with
  • Read your HOA’s rules on contractor parking and work hours, which many Westchase and New Tampa communities set
  • Choose a conditioned room for delivered cartons rather than the garage

If you live in a condo, the association’s sign-off usually comes before everything else on this list.

What’s included with Cabinet IQ of Tampa

Your project starts with a complimentary consultation and estimate. Detailed design work follows our design-retainer policy, and the retainer is credited toward your cabinet order. From there, we coordinate your cabinets, countertops and their installation with our fabrication and installation partners. Any other remodeling work is addressed according to your agreed proposal.

Before install day, the finished design goes through our 57-point design Quality Assurance Check. Our workmanship carries a 12-month warranty, and manufacturer warranties vary by product line. We offer sinks, and whether one is included depends on your proposal. We don’t reface or paint existing cabinets, since we replace them.

Cabinet IQ cabinets

Only replacing the cabinets?

Not every kitchen needs a full renovation. If the sink, range and refrigerator are staying where they are, new cabinets and stone may be the whole job. Our cost calculator gives you a starting figure from the length of your cabinet runs.

Try the cost calculator

Kitchen contractors near Tampa

From our Gunn Highway showroom, we take on kitchens across Tampa and in these nearby towns:

North Tampa, Brandon, Plant City, Zephyrhills, Lakeland, Clearwater, St. Petersburg.

Frequently asked questions

  • The total follows your cabinet tier, your stone and how much of the room changes. The kitchen cost calculator gives a first range for cabinets. Your consultation turns your choices into a full price.

  • Florida’s owner-builder exemption lets you permit work on your own home, but you take on the legal responsibility a contractor would carry. If you sell or lease the house within a year of completion, the law presumes you built it to sell.

  • Yes. Builders and contractors bring their clients to our showroom to choose cabinets and stone together. We then design those pieces and coordinate installation around the rest of their schedule.

  • Start by asking which parts of the job the contractor coordinates, and who pulls any permit. The checks in how to choose a kitchen remodeling company in Tampa cover deposits, liens and the rest.

  • Ask for certificates of general liability and workers’ compensation, then confirm them with the insurer directly. If an uninsured worker is hurt in your home, the claim can end up on your own homeowner’s policy.