How Long Does A Kitchen Renovation Take?

Kitchen renovation is one of the most delicate projects you can take on and requires you to tread carefully, so you don’t leave things out. At the same time, it can take an ample period to complete. So, it’s understandable to be worried about how long a kitchen remodel takes. 

As soon as you have an estimate of how long your renovation will take, you can begin planning how you will incorporate a kitchen remodel into your already packed calendar. It is much easier to get your kitchen ready for use when you have a strategy in place before you start.

Drawing out your kitchen renovation plan and how you want your new kitchen to look is probably going to be the activity that gives you the most pleasure. During the design phase, you will have the opportunity to select new kitchen cabinets, flooring, countertops, appliances, and paint colors. Choosing new kitchen cabinets is one of the most exciting parts of the process.

What Is A Kitchen Remodeling Timeline?

Depending on the scope of the project, the duration of a kitchen renovation might range anywhere from a few 4 – 7 weeks or even a year. This, of course, depends on the extent of the work and the availability of the necessary materials.

To help you better comprehend each stage of the project, we have broken down the overall timeline into manageable chunks that span a regular 5-week plan.

In this guide, the processes involved in remodeling a kitchen are often the same from one project to the next, but they can differ depending on the size of the work

Week 1

This is the very first phase of your renovation plan. You may expect the first week to go smoothly. The first day of your construction crew’s task should involve site assessment and preliminary planning.

Pre-construction Meeting

The remodeling process will be explained in detail as the project manager, superintendent, and design team all sit down with you. If you have any concerns regarding how the renovation will influence your daily life or what to anticipate on the construction site, now is the time to bring them up.

The crew will also explain their strategy for protecting the areas of your home that are not included in the renovation from the dust and noise generated by the working area.

Week 2

The actual project starts in the second week, which centers on prepping the place for development. Protective measures, demolition of the existing kitchen, and preparation of the drainage and electrical systems are all part of this process. This phase of your kitchen renovation project is quite tasking.

Protection

It does not matter how well-prepared and efficient the construction crew is; remodeling projects always end up in a chaotic mess. An effective protection plan will keep construction debris confined to the work zone.

This includes laying down floor runners to keep the dust from the construction boots off your carpets and plastic dust barriers to keep the dust contained.

Based on the scale of the house and the scope of the renovation, this step can take anywhere from 1-2 days. For a full-scale renovation project, it can take relatively more time.

Demolition

The idea of your kitchen renovation project is to create a better and a new kitchen space, and this comes with tearing down some old stuff. Once your home is suitably shielded from the havoc about to occur, your construction crew will subsequently tear down the existing kitchen. Everything from the cabinets and appliances to the drywall and flooring is removed and taken away before the replacement process begins.

If you have a severe aversion to loud noises, you might prefer to wait outside. On the plus side, demolition usually just takes a day and is the noisiest aspect of a construction job. Your home will certainly resemble a battleground that day, which is the bad news. Renovations are quite exhaustive because of this particular phase.

Drainage And Electrical

Now that your old kitchen is gone, you can begin remodeling it from the inside out. Technicians will perform any sewage or wiring reconfiguring necessarily as a result of any power connection adjustments. Drainage and electrical works are an important part of your renovation project.

Depending on the extent of the changes, an inspector may need to examine their work before the wall may be sealed again. Extensive work on the drainage and electricity will add days to the overall schedule.

Week 3 

It is this week that everything begins to fall into place. You’ll probably see your kitchen make a tremendous improvement. Most clients can not believe how fast this part of the process goes. At this phase, your renovation plan is moving towards completion. 

Drywall Repair

A large amount of drywall replacement is usually necessary during a kitchen remodel. Drywall repair typically takes between three and five days to complete.

The quantity of drywall that must be taken for drainage and electrical work, in addition to the quantity that will be removed as a byproduct of the demolition itself, greatly affects this factor. The wall must be taped, mudded, and textured as part of this process.

Painting 

Painting is a crucial part of your kitchen renovation; it adds life to the atmosphere in the kitchen. After the drywall has been installed, the surface must be painted before the cabinets can be installed. The majority of the time is spent doing nothing more productive than waiting for the paint to dry in between coats. This is typically a very short process. While this is going on, your construction crew can prepare the cabinets to be installed. 

Cabinet Installation 

Cabinets are the most important part of your kitchen renovation plan, and as such, it’s best to make the most alluring choices of cabinets. In most cases, this is the stage during which the most significant progress is made in terms of the shape that the kitchen will ultimately take. After the cabinets have been installed, you will finally have a better idea of how your kitchen will turn out.

Week 4

Do not become frustrated if it appears that the project will move at a slower pace from this point on. Everything of significance needs to be in place, which indicates that the same amount of care is currently being put into the lesser particulars.

This phase of the project is often the one that is delayed whenever any other phase of the project is extended beyond a week. Week 4 includes flooring, trim and finishes, and countertops. 

Week 5

At this point, everything should be starting to take shape, and the last few details just need to be ironed out. This is the conclusive phase of your kitchen renovation. 

Installing Appliances 

Installing fresh new appliances last is the most effective approach to prevent dents and scratches from occurring on the new surfaces. It is incredible what a brand new range made of gas and a refrigerator made of stainless steel can accomplish to fill in those few remaining empty areas. 

Cleaning 

At the conclusion of the job, the construction crew that you hired should, of course, leave the location tidy and ready for you to use. Some builders will go the extra mile by using a commercial cleaning service to ensure that your brand-new kitchen is pristine before the big debut of the space.

Conclusion

At this point, I hope this article has provided an answer to your question, “How long does a kitchen renovation take?”. To remodel a kitchen is a massive undertaking that calls for careful preparation. Although we have divided this phase down into manageable 5-week chunks, there are a number of variables that could cause your kitchen renovation to go over schedule.